Buy now

How to File a Mechanics Lien: Deadlines by State

Get Texas, California, Michigan and Georgia statutory lien waivers filled in free, no account. State Lien Kits from $49 for 12 months.

Get the free waivers

Filing a mechanics lien comes down to four things: send the early notice your state requires, record the claim at the right office before the deadline, serve the copies the statute lists, and sue to enforce it before the lien expires. The recording deadline is the one that cannot be fixed later: 90 days after your last work in Florida, Georgia and Michigan, 75 days in Ohio (60 on one- and two-family homes), 120 days in Arizona, the 15th day of the 4th month in Texas (3rd on residential jobs), and 90 days after completion in California, shorter if a notice of completion is recorded. Iowa posts liens on a state registry instead of at the county.

Step 1: Check that your early notice was sent

In most states a lien is only valid if you sent the preliminary notice on time: the California 20-day notice, the Texas monthly notice of claim, the Michigan and Ohio notice of furnishing, the Georgia notice to contractor, the Florida Notice to Owner. See preliminary notice deadlines by state. Michigan and Arizona require proof of that notice to be attached to the lien (MCL 570.1111; A.R.S. 33-993).

Step 2: Find your recording deadline

StateRecord the lien withinWhereLaw
Texas15th day of the 4th month after the last month you furnished (3rd month on residential jobs)County clerkProp. Code 53.052
California90 days after completion; 60 days (direct contractors) or 30 days (everyone else) after a notice of completion or cessation is recorded and mailed on timeCounty recorderCiv. Code 8412, 8414
Georgia90 days after you complete the work or last furnish materialsClerk of superior court in the countyO.C.G.A. 44-14-361.1
Michigan90 days after your last furnishingRegister of deedsMCL 570.1111
Ohio75 days after last work; 60 days on one- or two-family homes and condosCounty recorderR.C. 1311.06
Arizona120 days after completion; 60 days after a notice of completion is recorded and mailedCounty recorderA.R.S. 33-993
IowaPost within 90 days for full rights; later postings (up to 2 years and 90 days) have limited rightsState Mechanics' Notice and Lien Registry (MNLR), onlineIowa Code ch. 572
Florida90 days after final furnishingCounty official recordsFla. Stat. 713.08(5)

When the last day is a weekend or holiday, most of these states move it to the next business day, but Ohio and Arizona do not move a Saturday. The free lien deadline calculator applies each state's rule.

Step 3: Prepare a claim that meets the statute

  • The basics everywhere: owner's name, the property's legal description, your name and address, who hired you, a description of the work or materials, the dates you furnished, and the amount still owed after credits.
  • Sworn or verified: Florida, Texas, Michigan, Ohio and Arizona liens are sworn statements signed before a notary. California uses a verified statement and does not require a notary (Civ. Code 8416(b)).
  • State extras: Georgia requires a 12-point bold statement about the 395-day lien life and a notice of the owner's right to contest; California requires a Notice of Mechanics Lien served with the claim and a proof of service affidavit; a Texas lien on a homestead needs the bold "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN" statement (Prop. Code 53.254).
  • Recorder formatting: page size and top margins matter: 3-inch top margin in Georgia and Ohio, 2.5 inches in Michigan and California, 2 inches in Arizona, and a 3 by 3 inch blank box at the top right in Florida. Recorders reject pages that do not fit.

Step 4: Serve the copies on time

StateWho gets a copy, and when
CaliforniaServe the owner before recording (Civ. Code 8416)
GeorgiaOwner and contractor within 2 business days of filing, by registered or certified mail or statutory overnight delivery
TexasOwner, and the original contractor if that is not you, within 5 days of filing (53.055)
MichiganDesignee within 15 days of recording, personally or by certified mail, return receipt requested
FloridaOwner before recording or within 15 days after (713.08(4)(c))
OhioOwner within 30 days; if service fails, post it on the property within 10 more days (R.C. 1311.07)
ArizonaOwner within a reasonable time after recording
IowaThe state registry mails the owner when you post (Iowa Code 572.8)

Step 5: Calendar the enforcement deadline

A lien that is never enforced expires: 90 days after recording in California (Civ. Code 8460); 6 months in Arizona unless suit and a lis pendens are filed (A.R.S. 33-998); 1 year in Florida (713.22(1)) and Michigan (MCL 570.1117); in Texas 1 year after the last day you could have filed the affidavit (53.158); in Georgia suit within 365 days of filing plus a notice of commencement of the action (the lien is void at 395 days). An owner's notice of contest or demand can shorten these.

Step 6: Release it when you are paid

Once paid, give the owner a recordable release. Texas, for example, requires one within 10 days after a written request once the claim is paid (Prop. Code 53.152).

What we do and do not do

We do not prepare claims of lien or lien affidavits. Our State Lien Kit fills in the notices that protect your lien rights in Texas, Georgia, Michigan, Ohio and Iowa, with a deadline calendar for each job. Florida: see Notice to Owner vs. claim of lien. State details: Texas, California, Georgia, Michigan, Ohio, Iowa, Arizona.

Last reviewed November 22, 2026, from the statutes cited (state library checked November 21, 2026). General information, not legal advice. Forms software, not a law firm; not a substitute for the advice of an attorney.

4 min read

Lien Rights Kit
Lien waivers, notices and deadlines for subcontractors and suppliers, state by state. See pricing

Also from our guides