Lien Waiver Forms by State: Which Ones Are Statutory

Get Texas, California, Michigan and Georgia statutory lien waivers filled in free, no account. State Lien Kits from $49 for 12 months.

Get the free waivers

Six of the eight states we cover write the lien waiver form into the statute itself: Texas, California, Arizona, Michigan, Georgia and Florida. In most of them a waiver that does not follow the statutory wording does not waive anything, and a waiver that does follow it can cost you your lien even when the check bounces. Here is how the forms work.

Conditional or unconditional

A conditional waiver gives up your lien rights only when you are actually paid, typically when the check named in it clears. An unconditional waiver says you have already been paid and gives up the rights the moment you sign it. California's and Arizona's unconditional forms say it plainly: the document is enforceable against you if you sign it, even if you have not been paid. The safe habit is simple: sign conditional waivers to get paid, and unconditional waivers only after the money is in your account.

Progress (or interim, or partial) waivers cover a payment before the last one and usually keep your rights to retention and later work. Final waivers cover the last payment and the whole job.

Collecting lien waivers from your subs? Send each sub one free link. They fill in their own part of the state form, sign it and email it back to you.

TexasCaliforniaMichiganGeorgia

You pick the state form and type the project facts; each sub types its own facts and signs. Nothing is stored or sent by Lien Rights Kit. Forms software, not a law firm.

The statutory forms, state by state

StateStatuteFormsNotary
TexasProp. Code 53.284Conditional and unconditional, progress and final (4)No, for original contracts signed on or after Jan. 1, 2022 (53.281(b))
CaliforniaCiv. Code 8132 to 8138Conditional and unconditional, progress and final (4)No
ArizonaA.R.S. 33-1008Conditional and unconditional, progress and final (4)No
MichiganMCL 570.1115(9)Partial and full, conditional and unconditional (4)No
GeorgiaO.C.G.A. 44-14-366Interim and final (2), at least 12-point type, plus the affidavit of nonpaymentWaivers no; the affidavit is sworn
FloridaFla. Stat. 713.20Progress and final (2)No
OhioNo statutory form; waivers and releases are drafted freely (R.C. chapter 1311)
IowaNo statutory form; satisfaction of a lien is acknowledged on the state registry (Iowa Code 572.23)

Rules that trip people up

  • Only the statutory form counts. Texas makes a non-conforming waiver unenforceable (53.284(a)); California makes other waivers void unless you were paid in full (8126); Georgia allows only its two forms; Florida says nobody may require a different form (713.20(6)).
  • Georgia's 90-day trap. A signed Georgia waiver becomes conclusive 90 days after its date even if you were never paid, unless you file an affidavit of nonpayment in the county before the 90 days end and send a copy within 7 days (44-14-366(g)).
  • Bold notices. The Texas unconditional forms must start with a bold NOTICE at least 10-point and as large as the largest type in the document (53.284(c), (e)); California's and Arizona's unconditional notices must be as large as the largest type on the form.
  • No advance waivers. Michigan voids waivers demanded before work is done, except to the extent you were paid (570.1115(1)); Georgia voids waivers signed before you furnish (44-14-366(b)).

Get the forms

Fill in the statutory forms free: Texas, California, Michigan and Georgia. Florida treats preparing waivers for others as law practice, so the Florida forms come blank. Each form downloads as a Word file with a signing guide in English and Spanish.

Go deeper: conditional lien waivers by state, unconditional lien waivers by state, partial vs final lien waivers, subcontractor lien waivers and lien waiver vs lien release.

En español: renuncia de gravamen (lien waiver) en Texas, Georgia y Michigan

The four Texas and California waiver forms, one page each: conditional waiver and release on progress payment · unconditional waiver and release on progress payment · conditional waiver and release on final payment · unconditional waiver and release on final payment.

Statutes read on November 21, 2026. General information, not legal advice, and not a substitute for the advice of an attorney.