Conditional Waiver and Release on Progress Payment (TX & CA)
Short answer: the conditional waiver and release on progress payment is a statutory lien waiver form in Texas (Prop. Code 53.284(b)) and California (Civ. Code 8132). It releases your lien and payment bond rights (in California, also stop payment notice rights) for one progress payment, and only once the check that pays it has cleared.
Use when: you hand over paperwork for a progress (partial) payment you have not received yet, or one paid by check.
Fill in the Texas form free Fill in the California form free
On the form page, choose the conditional progress payment form. No account, no card. Each file has a signing guide and a Spanish reading copy; the English form is the one you sign.
Texas and California versions side by side
Both states print this form's wording in the statute. In Texas and California a waiver that does not follow the statutory form is generally not enforceable unless you were actually paid in full (Tex. Prop. Code 53.282(a) and 53.284(a); Cal. Civ. Code 8124 and 8126), so keep the wording exactly as printed.
| Texas | California | |
|---|---|---|
| Statute | Tex. Prop. Code 53.284(b) | Cal. Civ. Code 8132 |
| Takes effect | On receipt of the named check, once it "has been properly endorsed and has been paid by the bank on which it is drawn" | Only on your receipt of payment from the financial institution on which the named check is drawn |
| What it covers | The progress payment for labor, services, equipment or materials shown in the attached statement(s) or progress payment request(s) | Labor, service, equipment and material you furnished to your customer on the job through the Through Date you write in, including fully signed written change orders unless you list them as an exception |
| What it keeps for you | Unpaid retention, pending modifications and changes, and other items furnished | (1) Retentions; (2) unpaid extras; (3) earlier progress payments you gave a conditional waiver for but were not paid (you list the dates and amounts); (4) contract rights |
| Notice on the form | Tells the recipient to verify evidence of payment before relying on it | Notice in capital letters: the waiver takes effect on receipt of payment and no one should rely on it until satisfied you were paid |
| Notary | No, for original contracts entered into on or after January 1, 2022 (53.281(b)) | No |
Collecting lien waivers from your subs? Send each sub one free link. They fill in their own part of the state form, sign it and email it back to you.
You pick the state form and type the project facts; each sub types its own facts and signs. Nothing is stored or sent by Lien Rights Kit. Forms software, not a law firm.
Before you sign: four checks
- The check amount, maker and payee match the payment you are about to receive.
- Texas: attach the statement or progress payment request the form refers to, so it is clear which work it covers.
- California: the Through Date is the last day of work this payment pays for, not today's date.
- California: under exception (3), list every earlier conditional progress waiver you have not been paid for yet.
Fill it in free
Our free generators print the statute's text with your facts filled in, as a Word or PDF file: Texas conditional waiver and release on progress payment and California conditional waiver and release on progress payment. Page 2 is a signing guide and page 3 is a Spanish reading copy (the English form is the one you sign). Other states: Michigan and Georgia print their own waiver forms with different names; see lien waiver forms by state.
Protect the rest of this job
Texas: a waiver covers one payment. If you are a subcontractor or supplier, your lien rights for unpaid work on the rest of the job depend on sending each notice of claim on time. The Texas kit has the notices of claim for unpaid work and the retainage notice, with each send-by date worked out: $49 for 12 months. See what the Texas kit includes · Buy the Texas kit, $49
California: use the free lien deadline calculator to get your preliminary notice and lien dates for this job.
Questions
Is a conditional waiver and release on progress payment binding if the check bounces?
No. In Texas the form becomes effective only when the named check has been endorsed and paid by the bank; in California it is effective only on your receipt of payment from the bank the check is drawn on, and a conditional release also requires evidence of payment (Civ. Code 8124).
Can I use my own wording instead of the statutory form?
Not safely. In Texas and California a waiver that does not follow the statutory form is generally not enforceable unless you were actually paid in full (Tex. Prop. Code 53.282(a) and 53.284(a); Cal. Civ. Code 8124 and 8126). Use the form exactly as the statute prints it.
Does it need a notary?
No. The California forms have no notary block, and Texas forms for original contracts entered into on or after January 1, 2022 need only a signature (53.281(b)).
The other three forms: unconditional waiver and release on progress payment · conditional waiver and release on final payment · unconditional waiver and release on final payment. Related: conditional lien waivers in 4 states, Texas lien notices and deadlines, California lien deadlines.
Sources
Form text checked against the statutes on November 21, 2026; this page last reviewed November 23, 2026. Lien Rights Kit is forms software from EAI Management Services LLC, not a law firm. We prepare forms from the facts you enter; we do not give legal advice and we do not mail, file or record anything. Not a substitute for the advice of an attorney.