Preliminary Lien Notice Deadlines by State

Get Texas, California, Michigan and Georgia statutory lien waivers filled in free, no account. State Lien Kits from $49 for 12 months.

Get the free waivers

Most states make subcontractors and suppliers send an early notice to keep their lien rights: 20 days in California, Arizona and Michigan, 21 days in Ohio (only when a notice of commencement is recorded), 30 days in Georgia (only when a notice of commencement is filed), and in Texas the 15th day of the 3rd month after each unpaid month (the 2nd month on residential jobs). Miss it and the lien you file later can fail, however much you are owed.

The deadlines, state by state

StateNoticeDeadlineDelivery that countsLaw
California20-day preliminary notice, to the owner, direct contractor and construction lender20 days after first furnishing; a late notice covers only the 20 days before it and later workPersonal delivery, registered, certified or express mail, or overnight carrier; not plain first-class mailCiv. Code 8200 to 8216, 8110
ArizonaPreliminary twenty-day lien notice20 days after first furnishing; a late notice covers only the 20 days before itFirst-class mail with a certificate of mailing, or registered or certified mailA.R.S. 33-992.01
MichiganNotice of furnishing, to the designee and the general contractor20 days after first furnishing (laborers: 30 days after wages are due)Personally or by certified mail; complete on mailingMCL 570.1109
OhioNotice of furnishing, to the owner's designee21 days after first furnishing, only if the owner recorded a notice of commencement; never on home construction contracts; a late notice covers only the 21 days before itCertified or registered mail, overnight delivery, hand delivery or any method with written proof of receiptR.C. 1311.05, 1311.19
GeorgiaNotice to contractor, to the owner and the contractor30 days after the later of the notice of commencement filing or your first delivery; only if a notice of commencement was filedRegistered or certified mail, or statutory overnight deliveryO.C.G.A. 44-14-361.5
TexasNotice of claim for unpaid labor or materials, to the owner and the original contractor15th day of the 3rd month after each month you furnished and were not paid (2nd month on residential jobs); retainage has its own noticeIn person, certified mail, or a traceable carrier that confirms receipt; not first-class mail with a certificateProp. Code 53.056, 53.057, 53.003
IowaResidential: preliminary notice posted on the state registry (MNLR). Commercial: sub-subcontractor notice to the general contractorResidential: no day count, but what you can recover is capped by what the owner still owes when notified. Commercial: 30 days after first furnishingMNLR posting (the state mails the owner); commercial notice in writingIowa Code 572.13B, 572.33
FloridaNotice to OwnerBefore you start or within 45 days of first furnishingCertified, registered or Global Express Guaranteed mail (713.18)Fla. Stat. 713.06; see FloridaNTO

Weekends and holidays

California, Texas, Georgia, Michigan and Florida move a deadline that falls on a weekend or legal holiday to the next business day (Code Civ. Proc. 12a; Tex. Prop. Code 53.003(e); O.C.G.A. 1-3-1(d)(3); MCL 8.6; Fla. Stat. 713.011). Ohio and Arizona do not move a Saturday deadline (R.C. 1.14; A.R.S. 1-243), and for Iowa registry postings only a Sunday moves (Iowa Code 4.1(34)). If in doubt, send it a day early. Our lien deadline calculator applies each state's own rule and holiday list.

Three rules that catch people

  • Some notices exist only after a notice of commencement. In Georgia and Ohio the early notice is required only when the owner filed or recorded one, so check the county records, or ask the owner, before you decide you need nothing.
  • Late is better than never in California, Arizona and Ohio: a late notice still protects the most recent 20 or 21 days and everything after.
  • Texas counts months, not days, and each unpaid month starts its own clock. A job with three unpaid months can need three notices.

Keep proof

Whatever the state, keep the mailing receipt, tracking record or signed delivery receipt for every notice. California asks for a signed proof of notice declaration with the USPS or carrier record (Civ. Code 8118), and Michigan requires proof of notice of furnishing service to be attached to a claim of lien (MCL 570.1111). Our kits include a proof-of-mailing log with each state's delivery rules.

State guides and tools

California 20-day preliminary notice · Texas notice of claim and deadlines · Georgia notice to contractor · Michigan notice of furnishing · Ohio notice of furnishing · Iowa MNLR · Arizona deadlines · Florida Notice to Owner. The State Lien Kit ($49 per state, 12 months) fills in the Texas, Georgia, Michigan, Ohio and Iowa notices from the facts you type.

Last reviewed November 22, 2026, from the statutes cited above (state library checked November 21, 2026). Forms software, not a law firm; not a substitute for the advice of an attorney.

4 min read

Lien Rights Kit
Lien waivers, notices and deadlines for subcontractors and suppliers, state by state. See pricing

Also from our guides